Rotate device to landscape HDD Console is optimized for horizontal mobile operation.
CURRENT JOB No bore selected
STANDBY
Signal QC Good
System Time 12:03:55
80%
System Time 12:03:55
Distance 121.5 m
23 rods
12 1 2 3 4 5 6 7 8 9 10 11 12
ACCEPTED SURVEY
Survey Rod Bit Distance Survey Distance Survey Depth Incl Az TF Time
ACCEPTED SURVEY Accepted surveys - 0 records
Survey Rod Bit Distance Survey Distance Survey Depth Incl Az TF Time

Job Information

Run Information

Entry point

HDD PROJECT LIFECYCLE 5 stages connected
  1. Pre-bidGIS imagery · route feasibility
  2. Bore designradius · stress · mud window
  3. Field executionlive survey · QC · pressure
  4. As-builtGPS timestamped bore log
  5. Closeoutclient PDF · CSV · CAD/GIS

As-built Package

Risk & Automation

Utility conflict0 alerts
Frac-out riskLow
Geotech modelImported
Digital twinUpdated
Ready for closeout package.